Главная страница
The most common problems arising from the absence or incorrect formation of a financial model:
• Unpredictability of financial cash flow
• Uncertainty of the project payback period
The financial model created by our specialists is developed within the framework of the project concept and is an integral part of it, that is, it is not offered as a separate service
The question that investors most often ask. Average costs range from 600 USD to 1,500 USD per square meter. These costs directly depend on the design features of the building, architectural design, number of floors, location and landscape setting. Return on investment within a period of 7 to 12 years is considered a good result, and from 12 to 15 years are typical values for projects operating in difficult economic conditions/
One of the latest implementations of our financial model is the reconstruction of SPUTNIK Mall in Almaty. Indicators improved: GLA by 16%, daily attendance by 22%, annual tenant turnover by 25%, shopping center income by 33%.